Featured Project:

Trident Park

Projects

  • Trident Park

    We were the Owner’s Engineer for Viridor’s Trident Park energy from waste facility based in Cardiff.

  • Kilroot Advancion® Energy Storage Array

    Fichtner provided full technical due diligence for this 10MW battery energy storage system (BESS).

  • 570MW Offshore Wind Farm, UK Waters

    Fichtner is currently engaged to undertake technical due diligence on a 570MW offshore wind farm, which is currently under construction.

  • Energy Works Hull

    We provided technical due diligence as Lenders Technical Adviser and continue to act as Owner’s Engineer for Energy Works Hull, the first CfD funded waste project.

  • Kingspan

    Fichtner is currently engaged by Kingspan Energy Ltd to provide independent technical review of its portfolio of rooftop mounted solar photovoltaic (PV) facilities.

  • Cardiff Anaerobic Digestion Plant

    We acted as Lenders Technical Adviser, Owners Engineer and provided detailed engineering services for the Anaerobic Digestion Facility at the Dwr Cymru Welsh Water, Waste Water Treatment Works in Cardiff.

  • Lakeside EfW

    Fichtner were Lender’s and Owner’s Engineer for the construction of a two-stream Energy from Waste facility at the Colnbrook (London Heathrow) site of Grundon Waste Ltd.

  • Riverside RRF

    We have been providing technical advice to the Cory Environmental facility at the Riverside Resource Recovery facility at Belvedere since project inception in 1992

  • 250 MW Offshore Wind Farm, UK Waters

    Fichtner has been appointed to carry out technical due diligence on behalf of investors as they assess the potential purchase of shares in a 250 MW Offshore Wind Farm, which is currently at the pre-construction stage.

  • Allerton Park Waste Recovery Park

    We provided Owner’s Engineer and Construction Management services for the Allerton Waste Recovery Park in North Yorkshire.

  • Ardley ERF

    We provided technical due diligence, engineering support and Owner’s Engineer for Ardley Energy Recovery Facility in Oxfordshire.

  • Barton and Ince Biomass Power Stations

    Fichtner were appointed to provide technical support in the development of two 20MWe net power output biomass power stations.