Featured Project:

Trident Park

Projects

  • Trident Park

    We were the Owner’s Engineer for Viridor’s Trident Park energy from waste facility based in Cardiff.

  • Energy Works Hull

    We provided technical due diligence as Lenders Technical Adviser and continue to act as Owner’s Engineer for Energy Works Hull, the first CfD funded waste project.

  • Cardiff Anaerobic Digestion Plant

    We acted as Lenders Technical Adviser, Owners Engineer and provided detailed engineering services for the Anaerobic Digestion Facility at the Dwr Cymru Welsh Water, Waste Water Treatment Works in Cardiff.

  • Lakeside EfW

    Fichtner were Lender’s and Owner’s Engineer for the construction of a two-stream Energy from Waste facility at the Colnbrook (London Heathrow) site of Grundon Waste Ltd.

  • Riverside RRF

    We have been providing technical advice to the Cory Environmental facility at the Riverside Resource Recovery facility at Belvedere since project inception in 1992

  • Allerton Park Waste Recovery Park

    We provided Owner’s Engineer and Construction Management services for the Allerton Waste Recovery Park in North Yorkshire.

  • Ardley ERF

    We provided technical due diligence, engineering support and Owner’s Engineer for Ardley Energy Recovery Facility in Oxfordshire.

  • Baldovie EfW Reinstatement

    Fichtner provided engineering, project management and operations and maintenance support services to the Dundee Energy Recycling Ltd (DERL) Baldovie EfW Plant during the reinstatement and refurbishment of the plant.

  • Bayley Street TLS Re-Build

    Fichtner managed pre-tender, tender and acted as principal contractor for the remedial works following a fire at the Bayley Street recycling centre, achieving a 17 week turnaround from arriving on-site.

  • Beddington ERF

    With construction underway, we are acting as Owner’s Engineer for this state of the art Energy Recovery Facility in South London.

  • Belfast EfW

    Having provided technical assistance during development, Fichtner were appointed Owner’s Engineer for the Port of Belfast EfW project, which will utilise advanced thermal treatment technology.

  • E.ON EfW Acquisition

    We provided technical due diligence for EQT in their acquisition of E.ON’s energy from waste businesses.