Skip to main contentSkip to page footer

Fichtner Through the Ages

Our History

Over 100 Years in the Service of Better Infrastructure

Since it was founded in 1922, Fichtner has been helping to shape the development of infrastructures and looks back today on a company history spanning more than a century. What began as an engineering firm has grown into a globally operating corporate group. Yet our goal has remained the same, namely sustainable improvement of infrastructures.

Take a journey through history with us and browse through the key milestones of our development.

Shaping the Transformation Together

The transformation of infrastructures is accelerating worldwide. Decarbonization, digitalization, and geopolitical shifts are placing greater demands on secure, resilient, and sustainable energy and water infrastructures. At the same time, new market structures are emerging as a result of the expansion of renewable energies, sector coupling, the hydrogen economy, storage technologies, and smart grids. Infrastructure projects are becoming increasingly complex, requiring collaboration across various disciplines, technologies, and stakeholders within integrated, end-to-end solutions.

In a dynamic market environment, Fichtner supports infrastructure transformation worldwide. Its companies and teams of experts are integrated into its international network, enabling their experience to be pooled and made available globally. Interdisciplinary collaboration thus becomes a success factor, with engineering, digitalization, and management consulting becoming increasingly intertwined. With a technology-neutral approach, Fichtner helps its clients develop the right solution for every challenge – therefore strengthening its role as an independent partner for tomorrow’s infrastructure.

learn more

One Hundred Years of Fichtner

Digitization is changing all business processes, infrastructures, the working world and private life. Decarbonization is shaping the economy and society. The energy transition is realigning energy markets. The substitution of fossil fuels can only succeed by developing storage technologies. Therefore, even greater investments are being made worldwide in the expansion of renewable energies, the development of energy storage systems and the resulting necessary grid expansion. The war in Ukraine highlights the urgency of switching to renewable energies, also to reduce political dependencies.

The global energy transition is making renewable energies increasingly competitive. For Fichtner, this opens up great opportunities. Based on its many years of experience with hydrogen technologies, Fichtner responds to the growing demand in this field by strengthening its team of hydrogen experts. Fichtner provides support in grid expansion and energy transition projects. With its diverse expertise and interdisciplinary collaboration, the Fichtner Group is able to meet even the most complex project requirements with consulting approaches from a single source. 

learn more

The Third Generation

Politically, the beginning of the new millennium in the U.S., Europe and the Middle East is marked by the Third Gulf War, which lasts until 2011. Environmental awareness continues to grow in society and politics. Renewable energies are being expanded worldwide. The roles of consumers and producers in the energy market are shifting, and small amounts of electricity can already be fed into the grids on a decentralized basis. This requires a new grid architecture. From 2007, the global economy is plunged into a financial and economic crisis. 

In the hands of the third generation, the company realigns itself. The focus is on employees working on projects in specialized teams. The company’s pillars of energy, environment, water, and consulting are expanded and strengthened by subsidiaries. Diversification of our order portfolio, both geographically and in terms of subject matter, is designed to protect the company from slumps in individual lines of business. The company thus proves to be well prepared even against the backdrop of uncertain project financing. Worldwide orders in the water industry, expansion of management and IT consulting, growth in the renewable energy and environmental protection sectors, and major projects in power generation and grid expansion see the company through the economic crisis. 

learn more

Major Projects and Holistic Consulting Approach

In the early 1990s, the World Wide Web becomes accessible to everyone and accelerates globalization. At the same time, climate protection increasingly becomes the focus of global politics. The climate conferences of the 1990s set the climate targets for the future. In order to reduce global CO₂ emissions by means of sustainable concepts, energy industries around the world are beginning to be restructured.

The expertise of specialists at Fichtner is in demand worldwide. Through interdisciplinary collaboration within the Group, Fichtner offers holistic consulting approaches for increasingly complex project requirements. Our portfolio of services includes planning and consulting for energy saving, efficiency enhancement, and pollutant reduction, as well as the development of renewable energy sources, energy storage technologies, and power grids. With new technologies in seawater desalination, Fichtner continues to be involved in the Middle East. 

learn more

Fichtner Broadens Its Base

Around the world, the nineties are marked by the struggle to find solutions to environmental pollution, mountains of waste, and air pollution. In Germany, investments are made in reunification and in developing the infrastructure of the new federal states of Germany. The expansion of renewable energies is being incentivized by the state. The energy market in Germany is liberalized and is now organized on the principles of a market economy. The opening up of the electricity market unleashes a wave of privatizations.

Fichtner founds a company in the UK for thermal waste treatment, renewable energies, and power transmission. Fichtner responds to the need for planning services to improve infrastructure in the field of water supply & sanitation in Germany by founding a suitably specialized subsidiary in Leipzig. The structural change in the German energy industry and the complex challenges for grid operators and energy providers lead to the expansion of our IT and management consulting expertise. In 1992, the growing company moves into the extension building at its Stuttgart site. 

learn more

Fichtner Becomes an International Group

In Germany, a rigid austerity policy, deregulation of the markets, and investment by companies are designed to boost the economy and bring down unemployment. Less government, more market, more competition, and more individual initiative are the buzzwords of the 1980s, but environmental protection also becomes a central issue in society. The working world and people’s private lives are being fundamentally changed by technological progress. In 1989, the Berlin Wall comes down, and a year later Germany celebrates its reunification and begins rebuilding the economy and infrastructures in the new federal states of Germany. 

In a difficult economic environment, Fichtner continues to grow. The techno-economic focus of our consulting services is extended, and the environmental business sector is consistently expanded. In addition to renewable energies, new business areas and sustainable consulting approaches are developed with the build-up of process engineering expertise in the fields of flue gas cleaning and wastewater treatment. By founding subsidiaries, Fichtner becomes an international group. Technological change takes hold at Fichtner, with computers dominating the new working world. 

learn more

Years of Growth

Global energy consumption is at an all-time high and continues to rise. The Club of Rome reflects on the limits to growth. In 1973, the oil price crisis triggers severe recessions in all industrialized countries. There is stagflation and uncertainty about the future of energy supply. In order to increase security of supply, European oil and gas production is expanded and emphasis is placed on the development of alternative and renewable energies. At the same time, driven by rapid technological change, automation begins to take hold in industry, plants, and grids.

Through workforce expansion and specialization in the fields of energy and grids, Fichtner is able to handle major power plant and power transmission projects as overall planner on an international scale. At the same time, environmental specialists are turning their attention to advising power plant operators. Fichtner continues to build up expertise in the field of renewable energies. With the establishment of Fichtner Asia in Singapore, the company succeeds in entering the Asian waste management market. In the Middle East, Fichtner plans the world’s largest and most modern seawater desalination plants, while in Saudi Arabia Fichtner supports the electrification of entire regions of the country. 

learn more

Fichtner Goes International

In Germany, the period of the economic miracle begins after the country’s reconstruction. The production of consumer goods is in full swing, industry is growing, and electricity consumption is rising sharply. New power plants are needed in Germany and the other industrialized countries to meet the rising demand for energy. The development of transportation and civil aviation makes even distant countries accessible and sets the stage for the globalization of the world economy. Support for developing countries through targeted economic aid becomes a political goal of the industrialized nations, and the first major international infrastructure projects are initiated.

Fichtner capitalizes on the economic upswing and wins clients: in the public sector, in power-intensive industry, and at development banks. International orders follow, and Fichtner develops into a globally active engineering and consulting company supporting energy-related infrastructure projects from conceptualization through to commissioning. In addition to the technical design of conventional power plants, environmental issues and waste management increasingly become a focus of our consulting activities. 

learn more

Stuttgart Becomes Head Office

The Second World War shakes the world until 1945. Europe has to reorganize and be rebuilt after the horrors and destruction of war. Under the Marshall Plan of 1947, economic aid is provided to many Western European countries, including Germany. The founding of the Federal Republic of Germany in 1949 is followed by the reintegration of that young republic into the world economy. The European Coal and Steel Community, created in 1951 to secure coal and steel resources and now considered the forerunner of the European Union, contributes to the political and economic stabilization of Europe.

Following difficult years on account of the war, Fichtner’s business operations come to a standstill towards the end of the war. The family flees the former Czechoslovakia and reunites in southern Germany after the war. Receiving their first energy-related orders in the Stuttgart area leads them to resume business operations in Stuttgart. 

learn more

The Beginnings

In the twenties, the development of European infrastructures is largely driven by advancing electrification. Steam power technology is being replaced by electrically powered machines. Island grids initially operated independently of each other are supplied with electricity by small power plants. To ensure redundancy for greater security of supply, the power grids are interconnected and a supply infrastructure is established. At the World Power Conference (WPC) in 1930 in Berlin, thousands of experts discuss the electrification of Europe. The boom and progress of the Roaring Twenties end with the Great Depression, which causes social misery and political unrest during the 1930s. In 1939, the Second World War breaks out. 

In 1922, the history of Fichtner begins in what was then Czechoslovakia as a small, owner-managed engineering firm initially specializing in the design and acceptance measurement of steam boilers. Soon the young company offers comprehensive consulting and engineering services in the field of energy, heating, and cooling technology. The founder of the company, Martin Fichtner, holds a technical presentation at the WPC in 1930 on the techno-economic aspects of heat management. 

learn more

2026

Fichtner Saudi Arabia

The existing branch in Saudi Arabia is converted into an independent subsidiary. In doing so, the Fichtner Group secures its market position, lays the groundwork for further market growth, and strengthens its role as a reliable and long-term partner for local clients.

2026

Sachsen Wasser Joins the Group

The Fichtner Group strengthens its expertise in international urban water management by integrating the Leipzig-based company ‘Sachsen Wasser GmbH’, which advises water supply and sanitation companies worldwide on operation & maintenance, organization, and finance.

2024

International Hydrogen Projects

Fichtner’s international expertise in hydrogen reaches a new level: After more than 30 years of experience in hydrogen project planning, the company enters a new dimension with the conceptual engineering of its first gigawatt-scale Power-to-X plant.

2023

Founding of Fichtner Baustellenservices

With this subsidiary, Fichtner strengthens its construction supervision and coordination capabilities in large-scale infrastructure projects, particularly in the areas of linear infrastructure such as overhead lines, cables, and offshore connections.

2023

Lange Joins the Fichtner Group

With the engineering and planning firm ‘Ingenieur- und Planungsbüro Lange GmbH & Co. KG’, the Fichtner Group strengthens its expertise in environmental and permit engineering for linear infrastructure projects and its fields of activity in environmental, spatial and urban planning.

2022

100 Years of Fichtner

A century of engineering expertise – Fichtner celebrates its 100th anniversary and stands today for independent consulting, technological expertise, and international collaboration.

2021

Founding of Fichtner Australia

In view of rising demand in the renewable energy, hydrogen, and thermal waste treatment sectors, a further subsidiary of the Fichtner Group is founded in Sydney.

2020

Fichtner Digital Grid
Germany

Fichtner develops a portal for connection management in the distribution grid, enabling requests for grid connection of distributed generation plants to be checked against available capacities and processed automatically. The immediate response accelerates the connection procedures, reduces the burden on the grid operator and thus promotes the necessary expansion of renewable infeeders over a widespread area.

2018

Noor-Quarzazate
Morocco

In the south of Morocco, commissioning of the second and third plant sections results in Africa’s largest solar power plant complex to date. As independent engineer, Fichtner supports the implementation of the three solar thermal power plants Noor 1-3.

2017

C/sells: energy system of the future
Germany

As the largest showcase of the SINTEG research and demonstration project, C/sells provides scalable model solutions for a sustainable energy supply and shows what the energy transition will look like: cellular, participatory and versatile. In this pioneering initiative, Fichtner handled project control and coordination for the 57 partners from science, industry, and grid operation.

2013

Malawi power sector

As part of Malawi’s largest energy project to date, Fichtner is contracted as owner's engineer for implementation of transmission lines and substations throughout the country, as well as rehabilitation of a hydropower plant.

2011

Photovoltaic project development
South Africa

Since the 2010s, many PV plants are increasingly being developed, financed, built and operated by project developers as “Independent Power Producers (IPP)” outside of Europe as well. Fichtner supports the world’s largest IPP photovoltaic projects as technical advisor.

2010

Grid connection of offshore wind farms
Germany

Since 2010, Fichtner has been supporting transmission system operators in the conceptual design, planning and construction of HVDC lines and grid connection projects of offshore wind farms in the North Sea, thus contributing to the success of energy transition projects in Germany.
(Photo: TenneT)

2010

Founding of Fichtner Vietnam

Fichtner’s order portfolio includes power supply projects in Vietnam, allowing the founding of a subsidiary in Hanoi. The local presence with another Group company intensifies our coverage of the Southeast Asian market.

2008

Carbon capture & storage (CCS)
Norway

Fichtner plans a retrofit of the 420-MW CCGT power plant at the Norwegian gas terminal Kårstø with a CO2 capture and compression plant. This demonstration project is the first time CCS technology is executed on a large scale.

2005

Kabul
Afghanistan

For many years, Fichtner works for development banks on the reconstruction of infrastructure destroyed during the war. In various parts of the country, we assist in the restoration and expansion of the electricity and water supply.

2002

Founding of Fichtner Italia

The Genoa-based subsidiary ‘Fichtner Italia’ supports the Fichtner Group with services for energy and waste management and strengthens the company’s presence in Southern Europe.

2001

Hybrid desalination plant
United Arab Emirates

With the Fujairah I CCGT power plant, Fichtner plans the world’s first large-scale hybrid desalination plant. The energy efficiency of the entire desalination process is optimized by combining thermal desalination with reverse osmosis technology.

1999

Founding of Fichtner Bauconsulting

Fichtner’s civil engineering services are expanded and independently marketed. The subsidiary ‘Fichtner Bauconsulting’ is founded for this purpose.

1998

500 kV power transmission
People’s Republic of China

For expansion of the 500-kV high-voltage transmission grid, Fichtner assists with design, tendering, contract award, and construction of an approx. 1000 km-long high-voltage double-circuit line. The river crossing over the Yangtze with a span of 2.3 km sets new standards worldwide.

1997

Windhoek
Namibia

Entry for Fichtner into water management projects of international development cooperation. For the City of Windhoek, Fichtner plans the first plant for an integrated drinking water and wastewater treatment system.

1996

Geothermal district heating project
Denizli, Türkiye

Fichtner leads an international consortium analyzing both the heating market and the geothermal utilization potential of the region.

1992

Recuperación de Energía
Barcelona

Fichtner acquires a stake in RESA in Spain, thus entering the Spanish-speaking market for waste treatment plants. Later, RESA becomes a wholly owned subsidiary and is incorporated into the Fichtner Group.

1992

Extension building at head office

Due to the steady growth of the Fichtner Group, an extension is added to the company building in Stuttgart. It enables the Group members located at the site, with a total of around 700 employees, to work closely together.

1992

Fichtner IT Consulting

To meet the challenges of rapidly developing information technology, Fichtner founds CAD Informationssysteme GmbH in 1992. Over the years, it has evolved into today’s Fichtner IT Consulting.

1992

Water supply & sanitation

After German reunification, Fichtner founds ‘Wassertechnik Leipzig’ with experienced water supply and wastewater treatment specialists from the new federal states of Germany. It is integrated into Fichtner Water & Transportation, which was founded later and is now active in water and waste management, environmental planning and geotechnical engineering, hydraulic engineering, transportation, and mining.

1991

Fichtner Management Consulting

The techno-economic focus of our consulting services is expanded from the nineties onwards. Management consultants strengthen the consulting teams, and economic consulting for the energy industry is added. The development of this line of business lays the foundation for Fichtner Management Consulting, which is founded later.

1991

Founding of Fichtner Consulting Engineers

Founded in 1991, Stockport-based Fichtner Consulting Engineers is now one of the UK’s leading specialists in thermal waste treatment, renewable energies, and power transmission.

1990

Wind energy incentive program
Germany

Fichtner advises the German government on the development of an incentive program for wind energy and draws up criteria for the design of the legal framework.

1989

Founding of Fichtner Pacific

Fichtner Pacific Engineers, founded in Taiwan, strengthens Fichtner’s presence in the East Asian region.

1987

Founding of Fichtner India

With the founding of our Indian subsidiary, the internationalization of the Fichtner Group gains momentum.

1987

Hydrogen technology

Fichtner assists in the development of a research and test facility for generating solar hydrogen with photovoltaic water electrolysis. For Fichtner, this is the cornerstone for building up expertise in dealing with hydrogen. We continue to work for the German Aerospace Center (DLR) to this day, primarily performing complex planning tasks for the cryogenic media supply of rocket propulsion systems and testbeds.
(Photo: ESA)

1985

Wind energy converter in Wilhelmshaven
Germany

Since the 1980s, Fichtner has been actively involved as owner’s engineer in the success story of wind energy.

1982

New head office in Stuttgart

Major projects change the way we work at Fichtner. In 1982, we move into our own office building where large project teams can organize their interdisciplinary collaboration perfectly and deal with complex issues quickly.

1980

Network control center in Yanbu
Saudi Arabia

Fichtner develops the first network control center with real-time data acquisition for the Yanbu power plant and desalination complex.

1977

Almería Solar Plant

Fichtner gets involved in the development of solar thermal power plants and assists in the development of solar energy throughout all stages: research & development, optimization, market launch, and commercial application. The first large-scale plant is built on a test site in the Spanish province of Almería.
(Photo: DLR)

1975

Al Khobar
Saudi Arabia

Our entry into the technology of thermal seawater desalination with the Al Khobar II desalination plant marks the start of Fichtner’s involvement in the Arab Gulf states.

1972

Java
Indonesia

Fichtner wins a contract for the electrification of a large part of the island of Central Java. This is followed by power transmission projects in the Middle East, Africa and Latin America for the Electrical Networks division.

1969

Elbistan
Türkiye

As leader of an international consortium, Fichtner is awarded a contract for design review and construction supervision of the 4x344-MW Elbistan lignite-fired power plant, at that time Türkiye’s largest power plant project.

1966

Ashuganj
East Pakistan

The 2x64-MW oil-fired steam power plant financed by German development aid is the first major overseas project for Fichtner. In 1971, the Fichtner team was evacuated on account of the war of independence, but our engineers were able to return following the establishment of the state of Bangladesh and successfully complete the contract in 1977.

1961

Municipal utility in Stuttgart

Fichtner wins a substantial order in the field of environmental technology right on its own doorstep in Stuttgart-Münster, encompassing detailed engineering and site management for a waste-to-energy plant – at that time one of the largest of its kind in the Federal Republic of Germany.

1954

Deutsche Linoleum Werke
Bietigheim

By planning the first of four industrial power plants for linoleum manufacturer ‘Deutsche Linoleum Werke’, Fichtner develops into a consulting and engineering firm for plant design and construction supervision.

1948

Fichtner in Stuttgart

Martin Fichtner and his sons Wolfgang and Kurt succeed in resuming business operations in southern Germany in 1948. The “Engineering Company Fichtner Consulting Engineers for Energy and Heat Management” receives its first energy-related orders in the Stuttgart area.

1930

World Power Conference in Berlin

The World Power Conference, forerunner of today’s World Energy Congress, addresses issues related to energy distribution and utilization. Martin Fichtner focuses on techno-economic contexts in his technical presentation on heating technology.

1924

Teplice-Schönau
Czechoslovakia

Initially, the small engineering firm, specializing in design calculations and acceptance measurements for steam boilers, is housed in the same building that the family lives in.

1922

Martin Eugen Fichtner
(1888-1957)

Martin Fichtner founds the “Technical Office for Energy and Heat Management”, thus laying the foundation for today’s Fichtner Group.