Ferrybridge Multifuel 1

Fichtner provided technical support during the development and construction of the Ferrybridge Multifuel plant including concept design, specification production, and specialist engineering support throughout the construction and commissioning phases.

Eastcroft WID Upgrades

We provided engineering, design, project management and environmental services to support the upgrade of the EfW facility.

Cramlington and Speyside Biomass

We are acting as technical adviser and Owners Engineer for Cramlngton and Speyside biomass CHP Plants on behalf of Estover Energy.

Brigg Biomass Power Station

Fichtner provided multi faceted technical, planning and commercial support to Centrica in the preparation of a Section 37 Development Consent Order and a FEED Study for their proposed 137MWe biomass power plant.

Brewery Biomass Plant Assessment

Fichtner provided expert technical assessment to Heineken on the Biomass CHP Plants installed at its breweries in Tadcaster and Manchester.

Belfast EfW

Having provided technical assistance during development, Fichtner were appointed Owner’s Engineer for the Port of Belfast EfW project, which will utilise advanced thermal treatment technology.

Beddington ERF

With construction underway, we are acting as Owner’s Engineer for this state of the art Energy Recovery Facility in South London.

Bayley Street TLS Re-Build

Fichtner managed pre-tender, tender and acted as principal contractor for the remedial works following a fire at the Bayley Street recycling centre, achieving a 17 week turnaround from arriving on-site.

Barton and Ince Biomass Power Stations

Fichtner were appointed to provide technical support in the development of two 20MWe net power output biomass power stations.

Baldovie EfW Reinstatement

Fichtner provided engineering, project management and operations and maintenance support services to the Dundee Energy Recycling Ltd (DERL) Baldovie EfW Plant during the reinstatement and refurbishment of the plant.