Ardley ERF

We provided technical due diligence, engineering support and Owner’s Engineer for Ardley Energy Recovery Facility in Oxfordshire.

Allerton Park Waste Recovery

We provided Owner’s Engineer and Construction Management services for the Allerton Waste Recovery Park in North Yorkshire.

Lakeside EfW

Fichtner were Lender’s and Owner’s Engineer for the construction of a two-stream Energy from Waste facility at the Colnbrook (London Heathrow) site of Grundon Waste Ltd.

Cardiff Anaerobic Digestion Plant

We acted as Lenders Technical Adviser, Owners Engineer and provided detailed engineering services for the Anaerobic Digestion Facility at the Dwr Cymru Welsh Water, Waste Water Treatment Works in Cardiff.

Brigg and Snetterton Bioenergy

We acted as Owner’s Engineer with full time site representation and CDM advisory services for the construction and commissioning of 2 straw fired CHP plants.

10MW SHORT TERM OPERATING RESERVE (STOR)

Fichtner provided pre-performance test inspection and performance test witnessing services to Welsh Power during the testing of the 10MW Dafen STOR facility in 2015.

Trident Park

We were the Owner’s Engineer for Viridor’s Trident Park energy from waste facility based in Cardiff.