Fichtner supported the delivery of a portfolio of utility-scale solar PV and battery energy storage system (BESS) projects across the UK, including sites in Shropshire, County Durham and North Ayrshire. The portfolio comprised three initial projects totalling over 165 MWp of solar capacity, with one co-located BESS installation, and was later expanded to a five-site programme. The developments contribute significant renewable generation and flexible grid support capacity within their respective regions.
Fichtner was appointed by Aukera Energy to provide technical advisory and Owner’s Engineer services across development, procurement and construction phases. The appointment built on earlier design optimisation and tender support work, ensuring continuity through to construction, commissioning and acceptance. Services were delivered under EPC and ICP contracting structures aligned with FIDIC-based arrangements.
Fichtner undertook project-specific optimisation studies, benchmark and detailed design development to inverter level, and prepared Employer’s Requirements for EPC tendering. The team delivered energy yield assessments, layout design and electrical single line diagrams, supported procurement and contract negotiations, and carried out structured design, environmental and HSE reviews. During construction, Fichtner monitored quality, reviewed contractor designs and witnessed commissioning and performance testing.
Additional scope included grid interface support and ICP technical specification development for contestable works, alongside ongoing interface management with DNO requirements. Fichtner also carried out construction supervision, defect tracking and acceptance certification (PAC, IAC and FAC) across the portfolio.
Deliverables included technical due diligence and design reports, Employer’s Requirements, tender evaluations, construction monitoring reports and acceptance certification.
Project Factsheet
Sites across the UK
Solar PV capacity
Construction programme
Key Facts
