Skip to main contentSkip to page footer

Cleve Hill Solar Park

Project Factsheet

Fichtner delivered comprehensive Owner's Engineer, Technical Advisor, and Principal Designer services for Cleve Hill Solar Park, a landmark 372.84 MWp solar PV development near Faversham, Kent–the first UK solar farm granted planning permission through Development Consent Order (DCO) and set to be the largest operational solar farm in the UK. 

The project includes a battery energy storage system (BESS) of up to 300 MWh, maximising the 350 MW import/export grid connection capacity, with power exported to the National Grid at 400 kV through the Cleve Hill substation. 

During preconstruction, we drafted Employer's Requirements and technical specifications for all construction elements, provided technical support for the National Grid connection process, and managed free-issued equipment procurement including modules, grid transformers, and harmonic filters. We assisted in discharging pre-commencement DCO conditions by producing drawings, management plans, and reports for approval by the local planning authority and stakeholders including Kent County Council, Natural England, and the Environment Agency, while conducting pre-qualification and tender exercises for appointing contractors across solar farm, grid connection, and civil installation works.

Throughout construction delivery via a multi-contract strategy with three main contracts covering solar, civil, and substation works, Fichtner acted as Owner's Engineer and 'Engineer' under FIDIC Yellow Book for three Design and Build contracts and two Supply only contracts. 

Our integrated approach demonstrates our capacity to deliver large-scale renewable energy projects, providing proactive management, risk mitigation, and performance optimization as an extension of our client's team, ensuring successful delivery of this landmark solar PV development from preconstruction through to operational readiness.

Solar PV capacity
BESS capacity
Key Facts

Engineering and advisory for large-scale solar

  • Owner's Engineer (contracts administration, QA/QC, design interface management, programme review, site representation, acceptance certification)
  • Technical Advisor (project mobilisation, design review, contract finalisation, National Grid technical support, grid code compliance simulation studies)
  • Principal Designer (CDM Regulation 2015 compliance, HSE plan reviews, monthly HSE audits, HSE reporting and KPI tracking, close-out duties)
  • Preconstruction support (Employer's Requirements, technical specifications, DCO condition discharge)
  • Procurement support (free-issued equipment, contractor pre-qualification and tendering)
  • FIDIC Yellow Book 'Engineer' role (Design and Build and Supply contracts)
  • 372.84 MWp solar PV capacity
  • Up to 300 MWh battery energy storage system (BESS)
  • First UK solar farm granted DCO planning permission
  • Set to be the UK's largest operational solar farm