Immingham Energy Park

England

Project Factsheet

The Immingham Flexible Generation Project is located within VPI’s Immingham energy park in North Lincolnshire, one of the UK’s largest energy hubs. The development comprises a 50 MW fast-start gas engine facility (Energy Park A) and a new 299 MW open cycle gas turbine (OCGT) plant (VPI B), both designed to provide flexible generation to support grid stability and complement increasing renewable penetration. The site forms part of a wider 1,290 MW CHP complex supplying power and steam to local industry.

Fichtner was appointed as Owner’s Engineer to support the client during the construction phase, providing independent technical oversight across both assets. The role focused on monitoring contractor performance, reviewing design development, and supporting delivery in line with project requirements and programme objectives.

The core technical scope included detailed review of design deliverables for the gas engine plant and OCGT systems, including balance of plant, electrical systems, and control architecture. Fichtner assessed equipment specifications, performance parameters, and contractor documentation, alongside reviewing inspection and test plans and construction methodologies. Site activities were monitored to verify installation quality, with ongoing support provided for commissioning preparation and integrated system testing readiness.

Additional scope included grid connection and electrical infrastructure review, interface management across mechanical and electrical packages, and assessment of programme, risk, and contractual matters. Fichtner also supported contract administration, variation review, and verification of factory and site acceptance testing.

Deliverables included technical review reports, site inspection records, commissioning readiness assessments, and cost and programme commentary.
 

gas engine plant capacity
OCGT development capacity
Key Facts

Engineering support for flexible generation

  • Design and contractor deliverable review
  • Site inspection and quality assurance
  • Grid connection and electrical system review
  • Programme, risk, and contract administration
  • Testing and commissioning oversight (FAT/SAT)
  • Cost and schedule reporting
  • 50 MW gas engine plant + 299 MW OCGT development
  • Located at Immingham energy park (1,290 MW CHP site)  
  • Hydrogen-ready flexible generation assets