The Riverside Resource Recovery Facility (RRRF), located on the south bank of the River Thames, is one of the UK’s largest energy-from-waste (EfW) facilities, processing up to 785,000 tonnes of municipal waste per year and generating up to 72 MWe. The riverside location enables bulk waste delivery via barges and tugs, reducing road transport impacts. The adjacent Riverside Energy Park (REP) expansion will add further EfW capacity alongside a 30 MW low-carbon heat network.

Fichtner has provided long-term Owner’s Engineer and Technical Advisory services to Cory, supporting the project lifecycle from initial development of RRRF through to its construction, commissioning, and ongoing optimisation, and continuing into the development of REP.

For the RRRF, our team delivered project management during construction and testing, full-time site supervision, quality management, and contractor oversight. The scope included preparation of technical specifications, bid evaluation, EPC contract negotiation, and support to planning and permitting, including expert witness services and IPPC application submission.

For the Energy Park, Fichtner has undertaken feasibility studies covering battery energy storage, carbon capture, and CHP integration, alongside continued technical advisory support on plant and infrastructure interfaces.

Deliverables included technical due diligence reporting, design and construction reviews, feasibility assessments, and cost and programme commentary.

Waste throughput
Electricity generation
Heat network expansion
Key Facts

Owner’s Engineer for a leading UK EfW plant

  • Owner’s Engineer and Technical Advisory
  • Project management and site supervision
  • EPC procurement, tendering, and contract negotiation
  • Design review and quality assurance
  • Planning, permitting, and regulatory support
  • Feasibility studies (BESS, carbon capture, CHP)
  • Operational optimisation and technical due diligence
  • 785,000 tpa waste throughput; 72 MWe generation (RRRF)
  • Riverside location with barge-based fuel logistics
  • REP expansion includes 30 MW heat network