The Shannonbridge B project is a grid stabilisation development located in Ireland, combining a synchronous condenser with a battery energy storage system (BESS) to support system stability and renewable integration.
The scheme has a total capacity of 63.2 MW and includes up to 160 MWh of energy storage, providing frequency response and balancing services at a strategic location adjacent to the Shannonbridge 220 kV transmission station.
Fichtner was appointed as Owner’s Engineer and Technical Advisor to support the client during project development and delivery. The role focused on providing independent technical assurance across design, procurement, and construction, ensuring alignment with performance requirements and grid compliance obligations.
The core technical scope included review of the hybrid system design, encompassing the synchronous condenser, flywheel system, and battery storage integration. Fichtner assessed key equipment selection, electrical and control systems, and supporting infrastructure, alongside evaluation of contractor design deliverables, method statements, and inspection and test plans. Ongoing support was provided for construction monitoring and verification of installation quality.
Additional scope included review of the grid connection design and interface with the 220 kV transmission network, coordination between civil, electrical, and mechanical packages, and assessment of programme, risk, and commissioning readiness. Fichtner also supported contract administration and oversaw testing activities, including factory and site acceptance testing.
Deliverables included technical due diligence reporting, design and construction reviews, test verification, and cost and programme commentary.