Fichtner supported Vestas through a multi-year framework for power system studies associated with onshore wind power plant (WPP) developments across the UK. The framework covered a range of project configurations, from smaller wind farms of approximately 30 MW through to larger sites of up to 100 MW with multiple turbine strings and grid transformers. The work supported grid integration and compliance for new renewable generation connecting to UK transmission and distribution networks.
Fichtner was appointed to deliver a 3 year framework agreement for system studies and grid code compliance assessments. The role provided consistent technical support across multiple projects, with standardised study methodologies and scalable inputs aligned to plant size, configuration, and connection requirements.
The core technical scope included detailed power system analysis to demonstrate compliance with UK Grid Code and Engineering Recommendations. Fichtner undertook load flow, voltage regulation, and reactive power capability studies, alongside short-circuit analysis including Schedule 14 requirements. Additional assessments covered harmonics, voltage flicker, transformer energisation, and voltage unbalance. Dynamic simulations were carried out to assess voltage control, reactive power stability, fault ride-through (FRT), and fast fault current injection. Frequency response, load rejection behaviour, and controller model validation were also evaluated using industry-standard tools.
Additional scope included processing and reporting grid code compliance test data, supporting commissioning activities through site attendance, and undertaking supplementary dynamic studies to support design optimisation and compliance demonstration.
Deliverables included system study reports, simulation outputs, and grid compliance assessments.
Project Factsheet
System studies framework agreement
Wind farm capacity range
Key Facts