Skip to main contentSkip to page footer

Westfield Energy Recovery Facility

Scotland

Project Factsheet

Fichtner provided comprehensive support in the development, procurement, and funding of the Westfields Energy Recovery Facility (WERF) project. We guided the project from its initial concept through procurement to funding and delivered the Owner's Engineer (OE) role. During the planning and design phase, we served as both the Technical Advisor (TA) and Lenders' Technical Advisor (LTA), offering crucial vendor due diligence, EfW technology reviews for design and specification, and ITE services. 

Our role expanded during the construction phase, where we assumed the responsibilities of Owner's Engineer (OE) and IChemE Redbook Project Manager. We meticulously reviewed the key technical and commercial provisions, as well as the grid connection agreement, ensuring alignment with project objectives and industry standards. In the final phase, we oversaw the witness testing and commissioning, ensuring the Energy from Waste plant met all performance criteria. 

The project reached a significant milestone in June 2025, with the issuance of the takeover certification, marking its transition from a greenfield project to full commercial operation. Westfield EfW is a key player in sustainable waste management, with the ability to process approximately 250,000 tonnes of residual, commercial, and industrial waste annually. This not only provides a long-term waste treatment solution for Fife and the surrounding regions but also significantly contributes to Scotland’s landfill diversion and circular economy goals. The facility generates up to 24MW of reliable baseload electricity, enough to power approximately 70,000 homes and businesses.

Annual waste processing capacity
Electricity generation capacity
Homes and businesses powered
Key Facts

End-to-end support for a large-scale Energy from Waste facility

  • Technical Advisor (TA)
  • Lenders' Technical Advisor (LTA)
  • Vendor due diligence
  • EfW technology reviews for design and specification
  • ITE services
  • Owner's Engineer (OE)
  • IChemE Redbook Project Manager
  • Technical and commercial provisions review
  • Grid connection agreement review
  • Witness testing and commissioning oversight
     
  • 250,000 tonnes - Annual waste processing capacity (residual, commercial, and industrial waste)
  • 24MW - Electricity generation capacity (reliable baseload)
  • 70,000 homes and businesses - Number that can be powered by the facility