We are acting as technical adviser and Owners Engineer for Cramlngton and Speyside biomass CHP Plants on behalf of Estover Energy.
We acted as Owner’s Engineer during the development and construction of the 6.8MWe biomass CHP plant for the Combination of Rothes Distillers Energy (CoRDe) comprising the major distillers of Speyside in Scotland.
Having provided technical assistance during development, Fichtner were appointed Owner’s Engineer for the Port of Belfast EfW project, which will utilise advanced thermal treatment technology.
With construction underway, we are acting as Owner’s Engineer for this state of the art Energy Recovery Facility in South London.
We provided technical due diligence, engineering support and Owner’s Engineer for Ardley Energy Recovery Facility in Oxfordshire.
We provided Owner’s Engineer and Construction Management services for the Allerton Waste Recovery Park in North Yorkshire.
Fichtner were Lender’s and Owner’s Engineer for the construction of a two-stream Energy from Waste facility at the Colnbrook (London Heathrow) site of Grundon Waste Ltd.
We acted as Lenders Technical Adviser, Owners Engineer and provided detailed engineering services for the Anaerobic Digestion Facility at the Dwr Cymru Welsh Water, Waste Water Treatment Works in Cardiff.
We acted as Owner’s Engineer with full time site representation and CDM advisory services for the construction and commissioning of 2 straw fired CHP plants.
We provided technical due diligence as Lenders Technical Adviser and continue to act as Owner’s Engineer for Energy Works Hull, the first CfD funded waste project.
We have been providing technical advice to the Cory Environmental facility at the Riverside Resource Recovery facility at Belvedere since project inception in 1992
We were the Owner’s Engineer for Viridor’s Trident Park energy from waste facility based in Cardiff.