The Cramlington plant is a 28 MWe biomass plant and the Speyside a 15 MWe biomass plant. Both plants are fuelled from clean low-grade wood. The plants supply electricity to the grid and heat to nearby consumers – pharmaceutical plants for the Cramlington project and the Macallan Distillery for the Speyside project.

Our services during the pre-financial close included;

  • Environmental Permit advice;
  • EPC specification development;
  • development of heat and private wire offtake arrangements and;
  • support for negotiations with shortlisted contractors.

Our key roles during construction, commissioning and hand-over included;

  • Owners Engineer;
  • CDM Advisory;
  • HAZOP;
  • on and off-site inspections

Fichtner has been pleased to support Estover in the development of its 4 renewable projects from conceptual stage right through to the commencement of construction of the first 2 projects.

  • ISO 9001: Quality Management Systems
  • ISO 14001: Environmental Management
  • BS OHSAS 18001: Health and Safety Management
  • IChemE & IMechE Accredited Chartered Engineers
  • best copany
  • Gooad Recruitment
  • Investors in people
  • ISOQAR registered
  • Ichemf Acf
  • Institution of Mechanical Engineers