The Cramlington plant is a 28 MWe biomass combined heat and power (CHP) plant that supplies renewable heat to Aesica Pharmaceuticals and MSD. Speyside Renewable Energy Plant a 15 MWe biomass CHP plant that supplies renewable heat to the Macallan Whisky Distillery. Both biomass CHP plants are fuelled from clean low-grade woodchip sourced locally.

Our services during the pre-financial close included;

  • Environmental Permit advice;
  • EPC specification development;
  • development of heat and private wire offtake arrangements and;
  • support for negotiations with shortlisted contractors.

Our key roles during construction, commissioning and hand-over included;

  • Owners Engineer;
  • CDM Advisory;
  • HAZOP;
  • on and off-site inspections

Fichtner has been pleased to support Estover in the development of its 4 renewable projects from conceptual stage right through to the commencement of construction of the first 2 projects.