Projects

Featured Project:

Brewery Biomass Plant Assessment

  • Trident Park

    We were the Owner’s Engineer for Viridor’s Trident Park energy from waste facility based in Cardiff.

  • Kilroot Advancion® Energy Storage Array

    Fichtner provided full technical due diligence for this 10MW battery energy storage system (BESS).

  • 570MW Offshore Wind Farm, UK Waters

    Fichtner is currently engaged to undertake technical due diligence on a 570MW offshore wind farm, which is currently under construction.

  • 10MW Short Term Operating Reserve (STOR)

    Fichtner provided pre-performance test inspection and performance test witnessing services to Welsh Power during the testing of the 10MW Dafen STOR facility in 2015.

  • Energy Works Hull

    We provided technical due diligence as Lenders Technical Adviser and continue to act as Owner’s Engineer for Energy Works Hull, the first CfD funded waste project.

  • Kingspan

    Fichtner is currently engaged by Kingspan Energy Ltd to provide independent technical review of its portfolio of rooftop mounted solar photovoltaic (PV) facilities.

  • Brigg and Snetterton Bioenergy

    We acted as Owner’s Engineer with full time site representation and CDM advisory services for the construction and commissioning of 2 straw fired CHP plants.

  • Cardiff Anaerobic Digestion Plant

    We acted as Lenders Technical Adviser, Owners Engineer and provided detailed engineering services for the Anaerobic Digestion Facility at the Dwr Cymru Welsh Water, Waste Water Treatment Works in Cardiff.

  • Capacity Market Unit Delivery

    Acting as Owners Engineer, Fichtner delivered a detailed programme for 19 sites exporting a total of 348 MWe to National Grid.

  • Lakeside EfW

    Fichtner were Lender’s and Owner’s Engineer for the construction of a two-stream Energy from Waste facility at the Colnbrook (London Heathrow) site of Grundon Waste Ltd.

  • Riverside RRF

    We have been providing technical advice to the Cory Environmental facility at the Riverside Resource Recovery facility at Belvedere since project inception in 1992

  • 250 MW Offshore Wind Farm, UK Waters

    Fichtner has been appointed to carry out technical due diligence on behalf of investors as they assess the potential purchase of shares in a 250 MW Offshore Wind Farm, which is currently at the pre-construction stage.