Beddington ERF has been designed to treat 275,000 tpa of non-hazardous residual waste. The facility will generate 26 Mwe which will make the facility self sufficient and export 22 MWe to National Grid.
Our services included;
- Specification development;
- Assessment of tenders;
- Support for negotiations with shortlisted contractors;
- Owners Engineer;
- Full time site attendance;
- CDM Advisory.
The South London Waste Project won a major international award at the Partnerships Awards 2013 for the Best Waste/Energy/Water Project. The ERF will reduce the CO2 emissions by 128,000 tonnes each year.