The States of Jersey energy from waste facility has the capacity to process up to 105,000 tonnes of residual waste a year. The facility accepts all Jersey’s inert non-residual waste, after recycling, and replaces the three-stream incinerator plant located at Bellozanne which has processed the island’s waste since the late 70s.

Our role in the initial stages of the project included;

  • A review of the islands waste strategy both technically and commercially;
  • Feasibility study into the technical options for treatment;
  • A revised waste strategy for the island (2005).

As Owner’s Engineer and technical adviser Fichtner delivered;

  • Detailed technical specifications and contract documentation;
  • Full EPC Contract management;
  • 3D visualisation;
  • full time site supervision

The plant shares a chimney, cooling water system and ancillary services with the adjacent Jersey Electricity Company power station and produces approximately 9% of the Island’s electricity demand.