The Tilbury Green Power biomass fired power station is a 40 MWe facility at the Tilbury Docks in Essex. The plant uses conventional combustion technology and is fueled on waste wood.
As part of our service at Tilbury Green Renewable Power Facility, Fichtner provided;
- full pre-financial close technical due diligence;
- all up front engineering and procurement services;
- plant design, and;
- engagement of the EPC Contractor.
The project resulted in a joint investment by UK Green Investment Bank and ESB, and was the first investment by Irish utility ESB in the UK waste and bioenergy sector. The waste wood plant will produce over 300 GWh of electricity annually, which is enough to power more than 70,000 homes.